Insurance Restoration Process: 6 Steps

No-stress restoration

Storm damage does not have to mean months of phone calls. Our six-step insurance restoration process takes a roof from the first inspection to the final warranty with one team accountable for every step. It starts with a free 30-point property inspection and a written report you can send to your carrier.

FreeAssessment within 24 hours of your request
1–2 daysTypical roof installation
2–4 weeksFinal insurance payment after completion
The six-step insurance restoration process Flow diagram: 1 free 30-point inspection with photos, 2 you file the claim and we prepare the estimate, 3 we meet the adjuster on the roof, 4 scope and price are agreed with the carrier, 5 the roof is installed and the first check and deductible are paid, 6 final invoice and release of recoverable depreciation. No-stress insurance restoration, start to finish 1Free 30-pointinspectionPhotos + written report 2You file the claim,we build the estimateXactimate line items 3We meet the adjusteron the roofHaag-standard test squares 4Scope and priceagreed with carrierSupplements if itemswere missed 5Roof installed, firstcheck and deductiblepaidUsually one day formost homes 6Final invoice to carrierRecoverable depreciation released · lifetime warranty issued
The six steps at a glance.

Step 1. 30-point property inspection

A Roofing Giant specialist inspects your house or commercial building to determine the extent of damage to the interior, attic, roof, decking, rain gutters and downspouts, fence, window screens, window beading and glass, garage doors and more. You receive a written report with photos that you can later submit to your insurance company as proof of hail damage. During the first visit we also explain the insurance industry’s standards so you can make informed decisions. We never force a sale; if we do not find substantial damage, you can rest assured your home is fine.

Step 2. Estimating and the insurance process

Estimating

  • Xactimate: the estimating software more than 85 percent of carriers use
  • EagleView aerial measurement report for exact roof area
  • Building codes: IRC 2015, IBC and IECC items the estimate must include
  • Line-by-line review of the adjuster’s estimate

Insurance procedures

  • Filing the claim (you file; we prepare everything)
  • Contingency agreement
  • Adjuster inspection with your specialist present
  • Supplementing for missed items
  • Mortgage company endorsement of checks

Filing the claim

When we verify hail damage we advise you to call your carrier to open a claim. We would gladly do it for you, but Texas law and carrier rules require the policyholder to file. What we can do is hand you the extensive property inspection report to forward, in print and as a digital copy, and remind you of one important request: ask your carrier to allow your contractor of choice to be present at the adjuster inspection. If necessary, and only at your request, we make temporary repairs and tarp the roof immediately to prevent further damage.

Meeting the insurance adjuster

After you file, an adjuster is assigned and scheduled to verify the damage and write an estimate. Your Roofing Specialist meets the adjuster as a courtesy. Our policy is to let the adjuster do the job and step in only when a significant mistake is being made. Field adjusters are often not authorised to include certain items, including work required by the local building code; those items go to a desk adjuster or manager for approval before we begin. Our assessment is always documented with photos and supported by the International Residential Code and the city’s adopted codes.

Step 3. Project review with the property owner

Once the carrier approves the claim we meet with you to go over the scope of work, brand and product selection, and the project management details. Your specialist collects the deductible, normally your only out-of-pocket expense.

Your only out-of-pocket cost on an approved claim is normally your deductible, typically 1 to 2 percent of the insured value of the home. Texas law requires you to pay it and does not allow a contractor to waive, absorb or rebate it. Use the deductible calculator to see what your policy would pay.

Step 4. Project planning

  • Management review and project planning
  • City permit
  • Scheduling
  • Material and job orders
  • Material delivered the morning of installation, checked for the right products and colors
  • Material drop check: the first insurance check is collected once materials are on site

Step 5. Project completion

Installation usually starts around 7 a.m. and takes one to two days depending on size and complexity. Gutters, window screens and other trades follow the roof. Your specialist and a project manager meet the crew on site to relay any special instructions, and our quality assurance manager and crew supervisor stay involved until the final inspection.

  • Protect the property and cover the pool
  • Remove old layers of roofing
  • Inspect decking and replace damaged sheets
  • Inspect and fix wall flashings
  • Apply ice and water shield
  • Install valley metal or ice and water shield in valleys
  • Install synthetic underlayment
  • Install new shingles, ridge and ventilation

When everything is complete you and your specialist go through the inspection checklist point by point. Our accounting team then invoices the carrier for the remainder owed; the final check typically arrives in two to four weeks. When it does, your specialist delivers the thank-you package, the written warranty and a lien release.

Step 6. Customer delight

Happy customers are our greatest reward. After storm damage is confirmed in the field, we use the best technology available in the office, including NOAA storm data, EagleView and iRoofing, so your roof replacement is delivered with the best practices, materials and labor on the market today.

Restoration questions


How fast can you start?

The free assessment is scheduled within 24 hours of your request. Installation follows carrier approval, permit and material delivery, usually within one to three weeks.


Who talks to my mortgage company?

We do. If the carrier’s check names your mortgage lender, we handle the endorsement paperwork and inspections the lender requires.


What if the adjuster leaves items out?

We supplement. Code items, flashing, drip edge, ventilation and collateral damage are documented with photos and code references and submitted for approval.


Schedule Your Free Roof Inspection & Estimate

Free and no-obligation. Lifetime warranty on every roof we build. Call 24/7 or book online in under a minute.

Schedule Your Free Roof Inspection

Instant Roof Estimate

Roofing Giant

Roofing Giant · Dallas–Fort Worth

Get Your Instant Roof Estimate

Enter your address. We measure the roof from aerial imagery and show a preliminary estimate in about a minute. No obligation.

  1. 1 Address
  2. 2 Your roof
  3. 3 Schedule

Preliminary automated measurement from Google aerial imagery, not a certified roof report.

Analyzing your roof…

Locating the property

Estimated roof size
Pitch
Roof planes
With waste

Schedule Your Free Roof Inspection

Choose a convenient time in our scheduler. We’ll confirm the roof measurement on site, inspect for damage and provide the final written price.

Choose an Inspection Time

Prefer to talk now? Call (469) 498-6772 — we answer 24/7.

We found your property

An automatic roof measurement isn’t available for this address. Send us your information and Roofing Giant will prepare the estimate manually.

By submitting, you agree to be contacted by Roofing Giant about your request. We never sell your information.

Request received

Roofing Giant has your roof details and contact information. A specialist will reach out shortly.

Schedule Free Roof Inspection

Prefer to talk now? Call (469) 498-6772 — we answer 24/7.

This is a preliminary instant estimate based on automated aerial roof measurement and typical Dallas–Fort Worth conditions. Automated measurements can occasionally differ from field measurements. Final scope and pricing are confirmed after a free on-site inspection and can be affected by roof geometry, detached structures, material choice, decking, ventilation, code requirements, existing damage and flashing.